FEDERAL MINISTRY OF WATER RESOURCES AND SANITATION, ABUJA-INVITATION FOR INITIAL SELECTION FOR THE EXECUTION OF VARIOUS PROJECTS

FEDERAL REPUBLIC OF NIGERIA
FEDERAL MINISTRY OF WATER RESOURCES AND SANITATION
SUSTAINABLE POWER AND IRRIGATION FOR NIGERIA(SPIN) PROJECT
INVITATION FOR INITIAL SELECTION
WORKS
(DESIGN AND BUILD)
EMPLOYER: FEDERAL MINISTRY OF WATER RESOURCES & SANITATION
PROJECT: SUSTAINABLE POWER AND IRRIGATION FOR NIGERIA (SPIN) PROJECT
CONTRACT TITLE: REHABILITATION AND MODERNIZATION OF IRRIGATION SCHEMES:
LOT 1: DOMA IRRIGATION SCHEME (NASARAWA STATE) AND GALALA IRRIGATION SCHEME (BAUCHI STATE);
LOT 2: KAMPE-OMI IRRIGATION SCHEME (KOGI STATE) AND DUKU-LADE IRRIGATION SCHEME (KWARA STATE); AND
LOT 3: ADANI IRRIGATION SCHEME (ENUGU STATE) AND NDI-EZE IRRIGATION SCHEME (EBONYI STATE).
COUNTRY: NIGERIA
CREDIT NO.: 76370NG
ISD NO: FMWR&S/SPIN/D&B/RFP/2026/31
ISSUED ON: NOVEMBER 11, 2026

1. The Federal Government of Nigeria has received financing from the World Bank toward the cost of the Sustainable Power and Irrigation for Nigeria (SPIN) Project and intends to apply part of the proceeds toward payments under the contracts for Rehabilitation and Modernization of Irrigation Schemes:

Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State);
Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and
Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State).

2. The Federal Ministry of Water Resources & Sanitation, through the Federal Project Management Unit (FPMU) of the SPIN Project, intends to initially select Applicants for the Procurement of works (Design and Build), summarized below:
(a) Scope: Design review/upgrade (surveys, investigations and a modernised final design, including provision for Farmer-Led Irrigation Development) and rehabilitation/construction of intakes, lined canals, hydraulic and drainage structures and access roads, etc through to commissioning and handover. Modernisation includes replacing unlined channels with lined canals or piped/pressurized networks where feasible, improved water control and measurement structures, and innovations that improve scheme performance. Full details of the scope of works are provided in the Initial Selection Document (ISD).
(b) Performance: The works shall achieve high overall irrigation efficiency from source to field. This includes conveyance efficiency above 90% for lined canals, field application efficiency above 80% for surface irrigation, and distribution uniformity of at least 65%. The works shall also deliver an adequate, reliable and equitable water supply that meets crop water requirements throughout the irrigation season, to head, middle and tail-end users alike. Implementation within 18 months (two dry seasons) per Lot, plus a 12-month Defects Notification Period, under FIDIC Plant and Design-Build 2017, reprinted 2022 with amendments.

You need to be logged in to view the rest of the content. Please . Not a Member? Join Us
Tags
Administrator

admin@publicprocurement.org

No Comments

Sorry, the comment form is closed at this time.