CROP TRUST-INVITATION TO TENDER FOR DESIGN, SUPPLY, INSTALL, TEST, COMMISSION AND PLACE INTO SUCCESSFUL OPERATION A ROOFTOP SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEM (BESS) HYBRID POWER SYSTEM FOR NACGRAB IN IBADAN, NIGERIA

CROP TRUST
TENDER NOTICE: GCDT/NGA/02
DESIGN, SUPPLY, INSTALL, TEST, COMMISSION AND PLACE INTO SUCCESSFUL OPERATION A ROOFTOP SOLAR PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEM (BESS) HYBRID POWER SYSTEM FOR NACGRAB IN IBADAN, NIGERIA

Title of the Contract: Design, supply, install, test, commission and place into successful operation a rooftop Solar Photovoltaic (PV) and Battery Energy Storage System (BESS) hybrid power system for NACGRAB in Ibadan, Nigeria

Location of the works: National Centre for Genetic Resources and Biotechnology (NACGRAB), P.M.B. 5382, Moor Plantation Ibadan, Oyo State, Nigeria. NIGERIA

Name and address of the PEA: The Global Crop Diversity Trust, Platz der Vereinten Nationen 7, 53113 Bonn, Germany

Submission address: Attention: Olawuyi J. Sangokunle – Head, Procurement National Centre for Genetic Resources and Biotechnology (NACGRAB), P.M.B. 5382, Moor Plantation Ibadan, Oyo State, Nigeria. NIGERIA (Contact phone number-08063204067)

Number and title of the project: Project ID BMZ-No. 2018 01141: Capitalisation of the endowment fund of the Global Crop Diversity Trust and strengthening of national seedbanks (‘Seeds for Resilience’).

Approximate value: EURO 75,000– EURO 120,000

Other information: Please note this is a single stage national competitive bidding procedure with qualification for small admeasurement works contracts.

Type of notice: Tender Notice

You need to be logged in to view the rest of the content. Please . Not a Member? Join Us
Tags
Administrator

admin@publicprocurement.org

No Comments

Sorry, the comment form is closed at this time.